info@elevatorsolutions.co.uk
01732 824647 (Call 24/7)

Project

Lift Removal machine changes wigan

Recently we were contacted by one of our clients who asked if we could help carry out some lift machine changes, on short notice in Wigan, being London based we had to check our availability to make sure we had the required engineers to travel and work away, Once this was confirmed, we scheduled ourselves in and arrived on site with 3 days notice.

The brief

Lift Maintenance

The works we were instructed to carry out were as many machine changes as possible on a large estate in Wigan, due to some delays caused by some other labour previously on site, our team is known to be extremely capable when it comes to giving certain projects the push that is needed to help targets to be reached.

We carried out 3 large machine replacements on 3 14 floor tower blocks in the space of 4 days, Supplying all the lifting equipment required from our own large hire fleet of equipment, the counterweights were positioned on props and the cars tackled and de roped to allow these works to be carried out.

An obstacle that we came across straight away is that our client wanted to retain the main hoist ropes on the lift to use on the new machine, only for one journey to lower the car into the lift pit area and hang the counterweight in the top of the shaft to allow the car to be replaced, The issue was that nobody had foreseen large concrete bedplates were existing in the motor room and had to be removed, also meaning that new rope holes would have to be core drilled to allow the rope centres to be achieved on the new machine and bedplate. Being experienced lift engineers our team saw and highlighted this to our client straight away and de roping was agreed.

First we took delivery of 3 new Ziehl abegg gearless units weighing around 700kgs, these were transported to the top floor of each tower block and stored behind barriers while the motor room removal works were to be carried out.

lift-removal-professionals-elevator-solutions-wigan-6
lift-removal-professionals-elevator-solutions-wigan-8

Lift Removal

The 45 year old geared units were split and lowered through the double trapdoors, using Two ton chain blocks and a tractel minifor, the steel bedplates and concrete bedplate bases we also safely lowered down. All of the equipment was positioned onto pallets to be safely taken away from the building. Next All of the metal material was safely removed from site and recycled, Our company is a licensed waste carrier, and the concrete bases broken and disposed of into a skip. Oil was drained and disposed of in our own oil tank at our unit that will be recycled when the tank is full.

Next the new steel bedplates were lifted into the motor room using our two ton chain blocks and one of our many tractel minifors, These bedplates were then constructed and ready for the new machine to be installed.

The lift machines were then brought beneath the trapdoor area and carefully lifted up into the motor room area, using 1 ton beam trollies these were transported through the motor room on the tested existing lifting beams and tackled then bolted down onto the new steel bedplates.

Our client mainly uses us for lift removal services but in this case utilised our experience in the installation of lifts and lift equipment, They were left satisfied with 3 projects pushed on in a very short amount of time leaving their installers to continue with the projects being carried out. The motor rooms mentioned were completely cleared of all redundant equipment making the areas a clean and safe working environment for engineers working on site.

lift-removal-professionals-elevator-solutions-wigan-13

Our company is a lift removal specialist that offers the service of lift machine replacements to all our clients that are lift companies, sometimes carrying out these works whilst we are removing a lift to give installation teams the best start possible when it’s time for them to arrive on site.

All lifting equipment used was supplied by ourselves from our large hire fleet of equipment.

Are you looking for a professional team of elevator removal specialists?

We specialise in the lift removal and also provide high quality lift equipment to the lift industry. We will carry out a free site survey or you can email us with any enquiry.

Contact us today for a hiring quotation or to talk to us about our services. Get a free quote from us today by calling 01732 824647 or enquire below.

Trusted by the Best

What Our Clients Say

From luxury hotels to major commercial developments, we’re proud to be the lift removal and equipment partner of choice for some of the UK’s most respected names. Here’s what they have to say.
“All of the companies that I have referred Elevator Solutions to, without exception, have been super impressed with, not only their professionalism, but also their quality of service.”

“I have been hugely impressed by the way each member of the Elevator Solutions team takes responsibility and accountability for their tasks at hand, whilst demonstrating a sense of duty to put the customer first.”

Andrew Dennehy

Managing Director PEW Electrical Distributors Ltd

5-star service

Jack always delivers 5-star service, great variation of equipment for hire and quick to deliver products.

Aaron
“Highly recommend ESL Liftings”

Highly recommend ESL liftings, they’re quick to quote and supply equipment, they are my go to

Steve
“Reliable and Professional Service”

"The team handled our elevator removal quickly and safely—couldn't have asked for a smoother process."

Nigel
“Reliable Service”

Quick easy and reliable, competitive on price too

Roger

Get a Quote Today

Looking for reliable lift removal services or high-quality lifting equipment? Contact ESL Lifting for a free site survey and quotation. We aim to respond to all enquiries within 24 working hours.